|
2 no. 40'x 12' gable end bays stacked on top of each other. Offices upstairs, mess room and toilets downstairs. Units specification includes Plastisol steel exterior, steel 1m wide doors with vision panels, UPVC double glazed windows and ambulant access steel staircase. Due to a lack of mains drainage a Waste Treatment Tank was installed which then allows the bi product to be fed into the existing storm water drain. The tank then only requires emptying once every 18 months depending on usage.
|