TitleBanner_master_border

Civils, building works and mains connections

Philspace Ltd is able to undertake building, civils  and mains connections in preparation for the siting of your unit. This enables us to arrange delivery to coincide with completion of site works to ensure minimum disturbance to others. Our staff are highly trained, been working in the industry for many years and hold CCNSG (safety passport) for working within fuel refineries, along with slinger / banksman and appointed persons certificates.

Level foundations are essential to enable erection and to prolong the life of the building.

Installation of treatment plants, septic tanks and mains waste pumps connected to drains or soak away.

Installing mains waste

Toilet delivered and in use the same day

Foundations and waste prepared

Whilst the new unit is under construction, site is prepared for the new units arrival.

Steps, ramps and access all designed and built to comply with the latest disabled access regulations.